Areas in the public domain

Where areas within the site boundary will be public domain after construction, and the design/specification has been determined by the local authority/statutory body/planning permission etc, they can be excluded from the assessment of the ‘Safe Access’ criteria. Evidence would be required to demonstrate that this was the case.

Where the client/design team do not have control of the design of these areas, the development should not be prevented from achieving the credit.