Centralised air handling units (AHU)

The requirements of the:

  • Second sub-metering credit (New Construction).
  • Issue (BREEAM In-Use).

do not apply to centralised AHUs, where it is not technically feasible to sub-meter energy use by separate functional, tenanted or floor areas.

The credit(s) will be assessed based on the remaining applicable energy uses.

06-Mar-2024 - Scheme applicability extended to V6.