Shell and Core Options – Change option between Design Stage and Post Construction

It is acceptable for the Shell and Core option to change between Design Stage and Post Construction Review. For example, Option 1 (Green Lease Agreement) could be used to award credits in the Design Stage assessment. As a project progresses, if a tenant was found, Option 3 (Tenant collaboration) could then be used to award credits in the Post Construction stage assessment.