The requirements of the:
- Second sub-metering credit (New Construction).
- Issue (BREEAM In-Use).
do not apply to centralised AHUs, where it is not technically feasible to sub-meter energy use by separate functional, tenanted or floor areas.
The credit(s) will be assessed based on the remaining applicable energy uses.
06-Mar-2024 - Scheme applicability extended to V6.