The functional adaptation strategy study can be carried out during the operational life of the asset.
There is no requirement for this study to have been done when the asset was designed.
It is unreasonable to expect asset operators (some of whom have assumed management after the asset was built) to retrospectively provide an adaptation strategy during the design process.
The following evidence requirement is incorrect and will be amended in future revisions.