Indoor air quality plan – later consideration

Where BREEAM has been engaged at a later stage in the project (for instance, at the beginning of a Post-Construction Assessment) the IAQ plan must still be produced.

The late stage plan must clearly identify opportunities to improve indoor air quality that:

  • Were lost during design and construction.
  • Remain before hand-over and occupation.
  • Can be applied during operation.

The plan is focused on decisions and actions that can still be practically carried out.

The indoor air quality plan is an on-going consideration that extends into the operational life of the asset.