Operational waste – No managing organisation or no tenants on-site

Principle

If the asset as a whole meets the operational waste criteria, all relevant credits can be awarded.

No tenants

  • Where there are no tenants and
  • Within the assessment boundary, the managing organisation meets the operational waste criteria.

Answers C and D can be awarded.

No managing organisation

  • Where there is no on-site managing organisation and
  • Within the assessment boundary, all tenants meet the operational waste criteria.

Answers C and D can be awarded.

06-Apr-2023 - Updated to cover both situations described above.