Where credits have been awarded which require post-occupancy evaluation or an element of aftercare data collection (according to scheme requirements) from the building once operational and occupied, the data gathering must take place at the specified time and the findings reported to BRE.
The timing of this evidence gathering depends on the criteria of the BREEAM scheme having been undertaken. However, for all schemes, once the evidence is due for submission, it should be sent to [email protected] with the following title;
‘BREEAM Assessment Type Building Data BREEAM Assessment Reference‘
For example, a BREEAM 2011 New Construction assessment would use the following title when submitting their evidence;
‘BREEAM NC 2011 Building Data BREEAM-1234-5678’
This KBCN replaces KBCN0695 for HQM.