New Construction / UK / 2011 / 06 - Materials /

Mat 02 - Hard Landscaping and Boundary Protection

Information correct as of 25thApril 2024. Please see kb.breeam.com for the latest compliance information.

Astroturf (artificial grass) - KBCN0106

This is not be considered as hard landscaping and should be excluded from the assessment of this issue.  

Boundary Protection - KBCN0753

Only boundary protection specifically forming the site boundary should be included in the calculations. This may not necessarily be located on the boundary of ownership, but is the physical barrier which ostensibly encloses the development. Any other freestanding walls or fencing within the site can be excluded.

Exemptions from hard landscaping and boundary protection - KBCN00062

Where a third party, such as the local authority, enforces strict constraints on the materials that can be used by the project for hard landscaping or boundary protection, and these materials do not achieve a Green Guide rating of A/A+, it is possible to exempt these materials from the assessment of this issue, on the condition that robust evidence confirming this is given. In this instance the developer does not have control over the materials specified, therefore it is not appropriate to include them in the assessment.    

Gabion as boundary protection - KBCN000008

A gabion can be excluded from the assessment if it acts as a retaining wall or any other form of a supporting structure. If it acts purely as a boundary and a generic Green Guide rating cannot be found for a specification, the BREEAM assessor will need to submit a Bespoke Green Guide Query proforma detailing the specification details.  

Multi-storey car parks - KBCN0729

The hard landscaping requirements of this BREEAM issue do not apply to a multi-storey car park. The aim of the issue is to encourage the specification of new materials with low environmental impact to external hard surfaces only.  

Multiple buildings on the same site - KBCN0559

The areas of hard landscaping and boundary protection that need to be assessed on a site that contains several developments/buildings depends on the scope of works and scope of the assessment(s) being undertaken. Essentially, the areas that need to be assessed are all the areas of hard landscaping (as defined within the relevant definitions of the credit issue) and boundary protection within the construction zone (again defined within the relevant definitions) that are within the scope of works of the building under assessment. Therefore, if all buildings on one site are being assessed in one BREEAM assessment, then the hard landscaping and boundary protection related to all of these building's scope of works will need to be assessed. If there are several buildings with individual assessments and their own defined scope of works, then the hard landscaping and boundary protection applicable to the scope of works of each individual building will be assessed for each associated assessment. The assessment is concerned with the hard landscaping and boundary protection associated to the project under assessment, i.e. the areas under the control of the project under assessment. 

Playground or other specialist surfaces - KBCN0694

Where the hard landscaping surface is specified to meet safety related performance (e.g. non-slip or soft surfaces for playgrounds) or particular performance related requirements (e.g. specialist sports performance surfaces such as astro-turf, netball courts and running tracks), then these surfaces can be omitted from the assessment. The standard specification of surfaces for multi-use areas (e.g. cement, tarmac, asphalt) must still be assessed.

Recycled materials in hard landscaping - KBCN0975

When recycled material is to be used for hard landscaping, the Green Guide rating will depend on whether the material comes from the same site or from another location. Typically, on-site recycled material is treated with very little impact, or ignored, as there is little or no energy/material input in putting it in place. When recycled material is brought in from elsewhere, transport, as well as any processing the material has gone through to make it fit for purpose, will be taken into account. If the assessor is in doubt, they need to submit a landscaping proforma along with any supporting documentation on the materials and their use and BRE will provide a rating and/or guidance.

Retaining wall acting as site boundary protection - KBCN0304

Where a retaining wall also acts as the site boundary protection it must be excluded from assessment in this issue as boundary protection is not its primary function.  

Scope of hard landscaping - KBCN0634

For the purpose of assessment, hard landscaping includes (but is not limited to) parking areas (including manoeuvring areas, lanes, roads within the parking area), pedestrian walkways, paths, patios. The definition excludes basement parking, access or approach roads and designated vehicle manoeuvring areas, balconies, roof terraces,specialist sports areas (running tracks, netball areas etc.) and retaining walls.