Risk to Ecologist’s safety - KBCN0704

In some situations a significant safety risk may prevent a suitably qualified ecologist from attending the site to undertake a site survey. In these cases a desktop study can be used to demonstrate compliance, where the ecologist confirms that it is an acceptably robust substitute. In these cases, the assessor must provide evidence to confirm the type of significant safety risk present.  

Shared ecological enhancements - KBCN0656

A site-wide approach to ecological enhancements can be used on sites where multiple buildings share areas of soft landscaping. The enhancement benefits are applied to the individual building assessments within the site. Similarly, where a building comprises more than one assessment, eg different floor assessments, a green roof on top of that building can be used to award credits for each assessment for which the Land use and ecology issues apply. The benefit can be applied on a site-wide basis provided all developments are completed within the appropriate timeframe of a valid ecological survey.    

Suitably Qualified Ecologist – Other recognised organisations - KBCN0192

With regards to the definition of a Suitably Qualified Ecologist, in addition to the organisations already listed within the manual, full members of the following organisations are also deemed SQE's; Provided the individual meets all other requirements as outlined in the definition of a Suitably Qualified Ecologist (SQE).

Suitably Qualified Ecologist – Professional membership - KBCN0743

With reference to the definition provided in the technical guidance, ecologists can be considered as meeting Requirement 3 based on full membership of the organisations listed.

Those who are not full members may be considered as meeting Requirement 3, however the assessor must ensure and demonstrate, that the ecologist is covered by a professional code of conduct and is subject to peer review.

In all cases, Requirements 1 and 2 must also be met.

24 May 2024 - Updated to clarify that where ecologists who are not full members of a professional body meet the above guidance for Requirement 3, other than also meeting Requirements 1 and 2, no additional evidence or confirmation is required.

Temporary ecological enhancements prior to development - KBCN00065

Where a site has been acquired but development is not scheduled to start immediately, it is possible to determine the baseline ecological value of the site at this point. Furthermore, to recognise where positive measures to enhance ecology have been taken to manage the site until development starts, these enhancement measures will not impact on the baseline value for the purposes of the BREEAM assessment, provided that the following have been met: Clarification: This guidance is currently under development. Please contact BRE Global with specific project details for confirmation of whether this approach may be used. The aim of these issues is to demonstrate the impact that a project has had on the site ecology, but comparing the site pre and post development. BREEAM does not want to penalise sites that have put in temporary ecological enhancements that enhance the ecology while waiting for development to begin.