Habitat management plan – Level of detail required - KBCN0132

The level of detail required in the landscape and habitat management plan needs to be commensurate with the complexity and extent of the landscaped areas. If there is a limited amount of landscaping, then a simple plan would be acceptable, commensurate with the significance of the area assessed. Where the suitably qualified ecologist, appointed prior to commencement of activities on site, confirms that a landscaping and habitat management plan is not applicable due to the nature of the site and its surroundings, such as being nearly all or entirely hardstanding or having little or no external space, then full credits can be awarded for demonstrating that the relevant legislation has been followed.
21 Feb 2023 - Applicable to UK NC2018/V6

Landscape and Habitat Management Plan – SQE involvement - KBCN0564

Even if not stated explicitly, it is implied and expected that the Suitably Qualified Ecologist (SQE) does verify the content of the Landscape and Habitat Management Plan to ensure that it is consistent with the whole site ecological strategy.
19 Nov 2021 Applicability to UK NC2018 confirmed

Late appointment of the Suitably Qualified Ecologist - KBCN0603

If the Suitably Qualified Ecologist (SQE) is appointed after the commencement of activities on-site and if the other requirements of this issue are met, then credits can still be awarded, provided that:
13th Jul 21 Correction - applied to UK NC2018 LE05

Off-site ecological enhancement - KBCN0651

BREEAM does not recognise enhancements which are not within the boundary of the site being assessed, as the aims of the land use and ecology section relate to the ecological value and biodiversity of the specific site under assessment. However, off-site ecological enhancement can be accepted where: Full justification and robust evidence must be submitted when relying on this approach. BREEAM recognises that the red-line boundary drafted for planning purposes may not reflect the entire site within the control of the developer or building owner.

Shared ecological enhancements - KBCN0656

A site-wide approach to ecological enhancements can be used on sites where multiple buildings share areas of soft landscaping. The enhancement benefits are applied to the individual building assessments within the site. Similarly, where a building comprises more than one assessment, eg different floor assessments, a green roof on top of that building can be used to award credits for each assessment for which the Land use and ecology issues apply. The benefit can be applied on a site-wide basis provided all developments are completed within the appropriate timeframe of a valid ecological survey.    

Suitably Qualified Ecologist – Other recognised organisations - KBCN0192

With regards to the definition of a Suitably Qualified Ecologist, in addition to the organisations already listed within the manual, full members of the following organisations are also deemed SQE's; Provided the individual meets all other requirements as outlined in the definition of a Suitably Qualified Ecologist (SQE).

Suitably Qualified Ecologist – Professional membership - KBCN0743

With reference to the definition provided in the technical guidance, ecologists can be considered as meeting Requirement 3 based on full membership of the organisations listed.

Those who are not full members may be considered as meeting Requirement 3, however the assessor must ensure and demonstrate, that the ecologist is covered by a professional code of conduct and is subject to peer review.

In all cases, Requirements 1 and 2 must also be met.

24 May 2024 - Updated to clarify that where ecologists who are not full members of a professional body meet the above guidance for Requirement 3, other than also meeting Requirements 1 and 2, no additional evidence or confirmation is required.