Aircraft safety – developments in the proximity of airports - KBCN0912
Where it can be demonstrated that an assessed development, within or adjacent to an airport or similar, must restrict the ecological value of the site for reasons of aircraft safety (mitigating the risk of bird-strikes to meet local or national regulations), the approach for some issues in the Land Use and Ecology category can be adjusted. If in these circumstances, the client wishes to enhance ecological value on an external site, outside of the main development site, this can be considered in the following way for each issue:
Site selection: The development site only must be assessed.
Ecological value of site and protection of ecological features: The development site only must be assessed, but the recommendations may be tailored to suit the requirements of the relevant legislation.
Enhancing site ecology: The development site and the external site must be included in the SQE’s report and recommendations, albeit that, for the development site, the approach may to be to restrict biodiversity. Enhancements implemented in-line with the recommendations of the SQE are likely to apply to the external site.
Long term impact on biodiversity: Both sites must be considered in the SQE’s report to meet the prerequisite/first credit as applicable, albeit that, for the development site, the approach may to be to restrict biodiversity. Further credits in relation to improving and maintaining the site’s long-term biodiversity can be awarded on the basis of adopting these for the external site only, in line with the guidance.
Late appointment of the Suitably Qualified Ecologist - KBCN0603
If the Suitably Qualified Ecologist (SQE) is appointed after the commencement of activities on-site and if the other requirements of this issue are met, then credits can still be awarded, provided that:
- the SQE confirms that all relevant UK and EU legislation relating to the protection and enhancement of ecology has been complied with during the design and construction process
- the SQE confirms that their late appointment has not compromised the adoption of any measures to improve the assessed site's long term biodiversity.
13th Jul 21 Correction - applied to UK NC2018 LE05
Off-site ecological enhancement - KBCN0651
BREEAM does not recognise enhancements which are not within the boundary of the site being assessed, as the aims of the land use and ecology section relate to the ecological value and biodiversity of the specific site under assessment.
However, off-site ecological enhancement can be accepted where:
- It is within the wider site, surrounding or adjoining the development.
- The land is currently under the ownership of the developer and intended to remain so (i.e. there are no immediate plans to sell);
- The Suitably Qualified Ecologist (SQE) confirms that the proposed ecological enhancements are appropriate and more effective than can be done solely within the red line boundary;
- The owner remains responsible for the on-going maintenance of the land.
Full justification and robust evidence must be submitted when relying on this approach.
BREEAM recognises that the red-line boundary drafted for planning purposes may not reflect the entire site within the control of the developer or building owner.
Shared ecological enhancements - KBCN0656
A site-wide approach to ecological enhancements can be used on sites where multiple buildings share areas of soft landscaping. The enhancement benefits are applied to the individual building assessments within the site.
Similarly, where a building comprises more than one assessment, eg different floor assessments, a green roof on top of that building can be used to award credits for each assessment for which the Land use and ecology issues apply.
The benefit can be applied on a site-wide basis provided all developments are completed within the appropriate timeframe of a valid ecological survey.