Infrastructure / Projects / International / V6 /

4 Land use and ecology

Information correct as of 29thJune 2026. Please see kb.breeam.com for the latest compliance information.

Biodiversity Net Gain – Sites with a zero baseline - KBCN1884

When assessing a site with no ecological features, pre-development, the "BREEAM-CEEQUAL-HQM-Change-in-Ecological-Value-Calculator" tool available in BREEAM Projects, can be used to calculate the percentage biodiversity net gain from a zero baseline. This method caps the percentage biodiversity net gain, so the maximum number of credits that can be achieved using this approach is as follows: The cap on percentage biodiversity net gain seeks to ensure comparability between assessments, as it may be easier to achieve a high score from a zero baseline.

Using the CLIMB Model for Ecological Enhancement - KBCN1646

BREEAM Recognises CLIMB 1.2 Model as a means of complying with the requirements in BREEAM Infrastructure Issue 4.4 instead of the DEFRA Metric or BREEAM LUE calculator. The calculation you must do to get the percentage improvement in Biodiversity Net Gain from the CLIMB 1.2 model is as follows Percentage Improvement in Biodiversity Net Gain Legend
Notation Term Equation
A Area in Hectares -
NV Factor for Natural Value -
L Factor for Landscape Value -
S Difficulty Factor -
L Factor for Time -
I Factor for Indirect Influence -
T0 before influence/action -
T1 after impact/action -
U Present value CLIMB units
V Fabricated CLIMB units by creating biotopes
X CLIMB units lost through deterioration of the biotope
Y CLIMB units lost through indirect impact
Z CLIMB units lost through indirect impact
The credit allocation is for BREEAM Infrastructure is as follows:
CLIMB Model 1.2 Percentage Improvement in Biodiversity Net Gain BREEAM Infrastructure V6 Credits Awarded
Less than -25% 0
Between -24% and -6% 10
Between -5% and 4% 20
Between 5% and 9% 30
10% and above 40
Please provide the CLIMB Model tool and supporting documentation as evidence for your assessment. Please also note that CLIMB units for offsite enhancements are not recognised by BREEAM Infrastructure, therefore the above calculation should only consider onsite enhancement.
Information correct as of 29thJune 2026. Please see kb.breeam.com for the latest compliance information.