New Construction / International / V6 / 03 - Energy /
Ene 01 - Reduction of energy use and carbon emissions
Information correct as of 26thFebruary 2026. Please see kb.breeam.com for the latest compliance information.
Erratum – V6.0.0 Checklist A5 – Criterion 15 - KBCN1746
Checklist A5, Criterion 15 incorrectly states, 'The average g-value of the glazing is ≥ 60%.'
This should read as follows, 'The average g-value of the glazing is less than (or equal to) 60%'
The intent of this criterion is to limit the impacts of overheating. This will be updated in the next reissue of the technical manual.
LZC – Local regulations and private wire arrangements - KBCN1658
Where local regulations do not permit electricity generated by on-site renewables to be connected directly to the building, and where evidence of the relevant regulations is provided at QA, the requirement for a private wire arrangement can be waived.
Information correct as of 26thFebruary 2026. Please see kb.breeam.com for the latest compliance information.