Erratum – NC V7 – Ene 07 Flexible demand response - KBCN1876

This applies only to the UKNC V7.0 and INC V7.0 manuals. There is an error in the following: UKNC V7.0.0 Ene 07 Table 6.16 INC V7.0.0 Ene 07 Table 41 The corrected table is below:
Systems present  Points available  Flexible demand capability  Points awarded 
Electric space heating 1 Operation can be optimised based on signals from the electricity supplier or local renewable sources. 1
Electric space cooling 1 Operation can be optimised based on signals from the electricity supplier or local renewable sources. 1
Electric domestic hot water 1 Operation can be optimised based on signals from the electricity supplier or local renewable sources. 1
Electric vehicle charging points 2 Charging with one-way control based on signals from the electricity supplier or local renewable sources. 1
Charging with two-way control based on signals from the electricity supplier or local renewable sources. 2
Other systems or equipment with flexible demand capability 1 Installed 1
Battery energy storage 3 Installed battery energy storage with no flexible demand response capability. 1
The installed battery energy storage system is only capable of charging based on signals from the electricity supplier or local renewable sources. 2
The installed battery energy storage system is only capable of feeding electricity back into the grid. 2
The installed battery energy storage system is capable of both charging and feeding electricity back into the grid, based on signals from the electricity supplier or local renewable source. 3
  The technical manual will be updated accordingly in the next re-issue. The scoring for the Ene 07 calculator in the platform aligns with the above corrected table.

More than one system providing the same building service - KBCN1908

Where different systems provide the same building service to different areas of the building, the characteristics of the system that serves the highest proportion of the building's floor area must be assessed.  For example, if there are two electrical space heating systems serving the same building, only the system supplying the larger floor area must be assessed for compliance.