Flood Risk Assessment older than five years - KBCN1744

This sentence appears in the definition of 'Flood Risk Assessment': Where more than five years have passed since the FRA was carried out, evidence would be required to demonstrate that the basis of the FRA has not changed in that time. The requirement for evidence that the basis of the FRA has not changed where more than five years have passed is applicable only at Design Stage. It is not required at Post Construction Stage where a compliant FRA was undertaken at Design Stage and the development was carried out in accordance with that design.

GN38 Relating drainage reports to BREEAM UK NC - KBCN1564

Latest version: v2.0, November 2025 Guidance Note 38 (GN38) has been produced to help assist BREEAM Assessors relate the contents of drainage reports to the ‘Surface water run-off’ and ‘Minimising watercourse pollution’ criteria in Pol 03 for BREEAM UK New Construction 2018, V6/V6.1, and V7. The guidance note does not cover the criteria for ‘Flood resilience’. Completing the template is optional. It is an aid for demonstrating compliance and not a requirement. A separate template exists for BREEAM UK New Construction 2014 (see GN15). Download Guidance Note 38 View all Guidance Notes on BREEAM Projects (licensed assessors only)
27-Nov-2025 - Release of GN38 2.0