New Construction / NOR / V6 / 08 - Land Use and Ecology /
LE 03
Information correct as of 28thAugust 2025. Please see kb.breeam.com for the latest compliance information.
Relating green roofs to multiple assessments in the same building - KBCN1195
A green roof on top of such buildings can be used to award credits for each assessment for which the Land use and ecology Issues apply. The benefit can be applied to to all assessments undertaken for the building provided all are completed within the appropriate time-frame of a valid ecological survey.
Role of the SQE in planning and measures on-site - KBCN1372
The main role of the Suitably Qualified Ecologist for 'planning and measures on-site' is to make recommendations in their Preliminary Ecological Appraisal. It is important that these are incorporated into the project’s scheduling, management and resources and that ultimately, they are implemented in practice. The person coordinating this does not need to be the SQE, as long as this individual has the appropriate level of authority to take the relevant actions and the methodology is followed. At post-construction stage, evidence needs to demonstrate these measures are implemented in practice, through site visits and appropriate evidence. In some cases, the SQE may need to be involved themselves in checking their recommendations are implemented for certain measures, if they consider this is required. However, if this is required, it would be up to the SQE to confirm in their Preliminary Ecological Appraisal.
Site wide approach to ecological enhancements - KBCN1194
A site-wide approach to ecological enhancements can be used on sites where multiple buildings share areas of soft landscaping. The enhancement benefits are applied to the individual building assessments within the site. The benefit can be applied on a site-wide basis provided all developments are completed within the appropriate timeframe of a valid ecological survey.
Verification of an ecology report / information - KBCN1192
If the appointed ecologist does not meet the definition of a ‘suitably qualified ecologist’ (SQE) the report / information submitted to support the assessment must be verified by an individual who does.
1. The individual verifying the report must provide written confirmation that they comply with the definition of a ‘suitably qualified ecologist’.
2. The verifier must provide
signed confirmation that they have checked and approved the report. This must clearly reference the report and can be in the form of a signed letter or their printed name and signature on a completed pro-forma. In doing so, they are deemed to confirm that the report:
a. represents sound industry practice
b. is correctly, truthful, and objective
c. is appropriate given the local site conditions and scope of works proposed
d. avoids invalid, biased, or exaggerated statements
Such confirmation from the verifier must be provided in addition to all other information required by the relevant technical manual and referenced as part of the evidence submitted to demonstrate compliance.
It can take a number of years for an ecologist to meet the SQE definition. Verification of information by an existing SQE supports the practical application of the assessment criteria and is in line with industry practice.
13/08/2019 Updated to clarify, in practical terms, what evidence of verification will be considered acceptable.
Information correct as of 28thAugust 2025. Please see kb.breeam.com for the latest compliance information.