Refurbishment and Fit Out / UK / 2014 / 08 - Land Use and Ecology /

LE 04 - Enhancing Site Ecology

Information correct as of 28thMarch 2024. Please see kb.breeam.com for the latest compliance information.

Aircraft safety – developments in the proximity of airports - KBCN0977

Where it can be demonstrated that an assessed development, within or adjacent to an airport or similar must restrict the ecological value of the site for reasons of aircraft safety (mitigating the risk of bird-strikes to meet ICAO/EASA/CAA or equivalent regulations), the approach for some issues in the Land Use and Ecology category can be adjusted. If in these circumstances, the client wishes to enhance ecological value on an external site, outside of the main development site, this can be considered in the following way for each issue: Ecological value of site and protection of ecological features: The development site only must be assessed, but the recommendations may be tailored to suit the requirements of the relevant legislation. Enhancing site ecology: The development site and the external site must be included in the SQE’s report and recommendations, albeit that, for the development site, the approach may to be to restrict biodiversity. Enhancements implemented in-line with the recommendations of the SQE are likely to apply to the external site. Long term impact on biodiversity: Both sites must be considered in the SQE’s report, albeit that, for the development site, the approach may to be to restrict biodiversity. Credits for additional measures to improve the site’s long-term biodiversity can be awarded on the basis of adopting these for the external site only, in line with the guidance.

Ecological enhancements – large mixed use/multi-building developments - KBCN0588

At the Post Construction stage of assessment, for large mixed use/multi-building developments, where the whole site has not been completed and ecological enhancements have not yet been added, or where features are being added at a later date in an appropriate planting season: evidence from the client or principal contractor confirming planting will be completed within 18 months from completion of the development is acceptable.

Ecological value – timing of planting - KBCN0479

Where the 18 month deadline for the completion of the planting is likely to be exceeded due to the timing or phasing of the construction, the project team will need to clearly justify the reason for this variation, and provide a written commitment to carry out the planting within a reasonable and justifiable timescale.

GN13 Relating ecologist’s report and BREEAM - KBCN0626

Introduction This guidance note is to be used for registered BREEAM UK New Construction 2014 and RFO 2014 and International New Construction 2016 and RFO 2015 assessments, where an ecologist has been appointed by the client and has produced an ecology report for the proposed development. The purpose of this guidance note is to help the BREEAM Assessor relate the content of the ecologist’s report to the BREEAM Land Use and Ecology section criteria (assessment issues LE 02, LE 03 (UK only), LE 04 and LE 05). The guidance within this document has been produced to support the assessment of the aforementioned BREEAM issues and should not be interpreted as criteria. If the BREEAM Assessor chooses to use the template provided within this guidance note as evidence in the assessment (use of this document is optional) the assessor or the appointed suitably qualified ecologist must complete all relevant sections View full Guidance Note (licensed assessors only) View all Guidance Notes (licensed assessors only)
01/04/2020 Clarified applicability to UK RFO 2014 and International RFO 2015 schemes

Late appointment of the SQE and RFO schemes - KBCN0792

The late appointment of the ecologist does not necessarily impinge on achieving the credit, provided they would have had no advice for the early site layout decisions. The ecologist needs to provide an explanation detailing this, that they would have had no advice if they were appointed during the Preparation and Brief stage. This does not set a precedent. The early appointment of an ecologist has important benefits and must be followed as per the 'Early stage involvement from the SQE' Compliance Note within the technical manual. This KBCN is specific to situations where their late appointment has not had a bearing on the advice they could have provided.

Late confirmation of site boundary - KBCN0307

The ecologist must be appointed and engaged early on (equivalent RIBA Stage 1) so that they are able to inform the design brief. For projects where the site boundary is only confirmed at the next design stage (equivalent RIBA Stage 2), it would be acceptable to delay the full ecology survey until this time. In these circumstances, the ecologist's input at design brief may be based on a desk study or initial viewing of the site and its potential boundaries. The aim of early engagement with an ecologist is to facilitate and maximise potential ecological enhancement, exact boundary definition does not negate this.

No opportunity for ecological enhancement - KBCN0919

Where it can be demonstrated that there is no opportunity to make ecological enhancements, this Issue is not applicable and will be filtered out when the relevant scoping question is completed in the scoring and reporting tool. An example of such a case could be a retail building with a glazed shop frontage, where there are no other external elements or spaces for enhancement. Where evidence can be provided by the design team that there are no suitable external facades, roofs or other external areas within the developer's control, there is no requirement for a SQE or wildlife group to provide confirmation.

Off-site ecological enhancement - KBCN0651

BREEAM does not recognise enhancements which are not within the boundary of the site being assessed, as the aims of the land use and ecology section relate to the ecological value and biodiversity of the specific site under assessment. However, off-site ecological enhancement can be accepted where: Full justification and robust evidence must be submitted when relying on this approach. BREEAM recognises that the red-line boundary drafted for planning purposes may not reflect the entire site within the control of the developer or building owner.

Part 1 assessment – No external landscaping - KBCN0102

For Part 1 assessments, the 'Initial details' question in the assessment tools, 'Are soft landscaped areas within the scope of refurbishment or fit-out zone?', does not filter out the credit for Ecological enhancement if 'No' is selected. This takes account of the fact that this Issue is not just limited to areas of soft landscaping. It is possible to include measures listed under Relevant definitions such as bird/bat boxes, insect boxes, sedum roofs, tubs of plants, etc. The Issue allows for creative thinking about adding new ecology, even for buildings with no landscaped areas.


Risk to Ecologist’s safety - KBCN0704

In some situations a significant safety risk may prevent a suitably qualified ecologist from attending the site to undertake a site survey. In these cases a desktop study can be used to demonstrate compliance, where the ecologist confirms that it is an acceptably robust substitute. In these cases, the assessor must provide evidence to confirm the type of significant safety risk present.  

Shared ecological enhancements - KBCN0656

A site-wide approach to ecological enhancements can be used on sites where multiple buildings share areas of soft landscaping. The enhancement benefits are applied to the individual building assessments within the site. Similarly, where a building comprises more than one assessment, eg different floor assessments, a green roof on top of that building can be used to award credits for each assessment for which the Land use and ecology issues apply. The benefit can be applied on a site-wide basis provided all developments are completed within the appropriate timeframe of a valid ecological survey.    

Suitably Qualified Ecologist – Other recognised organisations - KBCN0192

With regards to the definition of a Suitably Qualified Ecologist, in addition to the organisations already listed within the manual, full members of the following organisations are also deemed SQE's; Provided the individual meets all other requirements as outlined in the definition of a Suitably Qualified Ecologist (SQE).

Suitably Qualified Ecologist – Professional membership - KBCN0743

With reference to the definition provided in the technical guidance, where requirements 1 and 2 are met, full members of the named organisations can be considered as a SQE for BREEAM on the basis of their membership. Those who meet requirements 1 and 2 who are not full members may be considered, however the assessor must ensure, and be able to demonstrate, that the ecologist is covered by a professional code of conduct, subject to peer review and that their expertise and experience is appropriate for the assessed project.

Temporary ecological enhancements prior to development - KBCN00065

Where a site has been acquired but development is not scheduled to start immediately, it is possible to determine the baseline ecological value of the site at this point. Furthermore, to recognise where positive measures to enhance ecology have been taken to manage the site until development starts, these enhancement measures will not impact on the baseline value for the purposes of the BREEAM assessment, provided that the following have been met: Clarification: This guidance is currently under development. Please contact BRE Global with specific project details for confirmation of whether this approach may be used. The aim of these issues is to demonstrate the impact that a project has had on the site ecology, but comparing the site pre and post development. BREEAM does not want to penalise sites that have put in temporary ecological enhancements that enhance the ecology while waiting for development to begin.

Timing of Ecological survey/report - KBCN0292

If the ecologist's site survey and/or report is completed at a later stage than required, the assessor would need to be satisfied that it was produced early enough for the recommendations to influence the Concept Design/design brief stage and leads to a positive outcome in terms of protection and enhancement of site ecology.
21/02/2017 Wording clarified.

Timing of Ecological survey/report - KBCN0292

If the ecologist's site survey and/or report is completed at a later stage than required, the assessor would need to be satisfied that it was produced early enough for the recommendations to influence the Concept Design/design brief stage and leads to a positive outcome in terms of protection and enhancement of site ecology.
21/02/2017 Wording clarified.

Information correct as of 28thMarch 2024. Please see kb.breeam.com for the latest compliance information.