Refurbishment and Fit Out / RFO Commercial V7 /

08 - Waste

Information correct as of 25thNovember 2026. Please see kb.breeam.com for the latest compliance information.

Compactor/baler requirement – Tenant obligation - KBCN1920

Where the installation of a waste compactor is applicable, but it is demonstrated that this will be a tenant obligation, the compactor itself does not have to be provided. Instead, an appropriately sized space and services or infrastructure to accommodate the relevant facilities must be provided.  This must be an identified, dedicated and suitable space, and evidence must be provided to demonstrate that this will be a tenant obligation. Suitable evidence of this includes: 

Individual and communal catering – Residential institutions - KBCN1898

The criteria set different requirements for the following scenarios:    In situations where there is catering equipment within self-contained dwellings or bedsits and additional communal catering facilities, recyclable waste storage must be provided in both.   However, to avoid over-provision, the size of individual containers and total volume of waste storage can be reduced by up to 50% in either the dwellings or the communal kitchens.    The approach must be justified based on the project team’s assessment of the likely waste streams, accounting for the type, location and number of catering facilities provided.
KBCN Reinstated 24-Sep-2026

Pre-refurbishment/demolition audit – late development - KBCN0537

Where the pre-refurbishment/demolition audit has not been done at RIBA stage 2/Concept Design, as required in the criteria, the credit can still be achieved. Robust evidence must be provided confirming that the timing of the pre-refurbishment/demolition audit has not compromised its ability to influence the design, consideration of materials re-use and the setting of targets for waste management. Evidence must demonstrate that this allowed decisions to be made before the start of strip-out/demolition works.
26.07.2018 Applicability of KBCN extended to include the UKNC2018 scheme.

Information correct as of 25thNovember 2026. Please see kb.breeam.com for the latest compliance information.