Refurbishment and Fit Out / RFO Commercial V7 /

06 - Materials

Information correct as of 10thSeptember 2026. Please see kb.breeam.com for the latest compliance information.

Definition – Reused in situ - KBCN1902

Definition A material qualifies as reused in situ where it meets all of the following: Exclusion Materials that remain in their original location and application throughout the works, including where they undergo minor processing such as cleaning, repair or redecoration, are considered as retained. These must be excluded from the Mat 03 calculator.

Early design phase LCA submission – Modified planning applications - KBCN1893

Requirement  In the Mat 01 Methodology, M1.2 requires the early design phase LCA to be completed and submitted to BREEAM within 20 working days of submission of the planning application.  Intent  This requirement is in place to ensure that the LCA is carried out during the early design stages and can meaningfully influence material selection and key design decisions, before the planning application fixes significant aspects of the external specification.  The timeframe of 20 working days post-planning submission is a concession to allow project teams to collate the LCA evidence for submission to BREEAM.  Submission of the planning application  In this context, this is the application that specifies and fixes the external products and materials that are considered in the LCA. By default, this is considered as the first application.  However, it may also be:  Where the requirement is applied to a supplementary or replacement application, the project team must provide additional evidence to demonstrate that the intent is met.  Additional evidence 

GN18 BREEAM Recognised Responsible Sourcing Certification Schemes and BREEAM Scheme Applicability - KBCN0723

Latest version: v3.7, May 2023 BREEAM awards credits for responsibly sourcing construction products (typically under the Mat 03 issue) to encourage responsible product specification and procurement in construction. To achieve these credits, applicable specified products (as listed in the relevant technical manual) must be covered by an Environmental Management System (EMS) or a responsible sourcing certification scheme (RSCS) recognised by BREEAM. Guidance Note 18 (GN18) lists the responsible sourcing certifications schemes recognised by BREEAM along with the relevant summary scores to be used in BREEAM assessments. Download Guidance Note 18 Download Guidance Note 18 v2.0 (optional for projects registered prior to release of v3.0 in September 2016) View all Guidance Notes on BREEAM Projects (licensed assessors only)

GN24 Demonstrating compliance with Mat 03 in BREEAM - KBCN0721

Latest version: v1.2, July 2026 Guidance Note 24 (GN24) provides additional guidance to assessors and specifiers on demonstrating compliance with the 'Measuring responsible sourcing' criteria in BREEAM (typically in Mat 03). It should be read in conjunction with the Technical Manual for the relevant assessment scheme. It covers: Download Guidance Note 24 View all Guidance Notes on BREEAM Projects (licensed assessors only)
15-Jul-2026 - Updated version released (v1.2)

GN51 Guidance on LCA and embodied carbon calculations for Mat 01 in BREEAM V7 - KBCN1684

Latest version: v1.0, July 2026 Guidance Note 51 (GN51) provides supporting information for the new Mat 01 criteria in BREEAM V7. Its development is driven by the introduction of new credit allocation criteria for Mat 01. While the core principles of measuring and reporting a building's environmental performance through life cycle assessment (LCA) and benchmarking were introduced in BREEAM UK New Construction 2018, significant revisions have been made to align the criteria across BREEAM schemes and with existing LCA frameworks and methodologies. This guidance note explains the primary methodology for Mat 01, including minimum requirements and the scope of the LCA. Download Guidance Note 51 View all Guidance Notes on BREEAM Projects (licensed assessors only)
15-Jul-2026 - Updated version released (v1.0)

Life Cycle Assessment – Similar buildings approach (GN20 – Section 4) - KBCN1834

Where multiple buildings are included within the scope of a single BREEAM assessment following the Similar Buildings approach, in accordance with Section 4 of GN20, unless identical, each building must be assessed and reported separately within the LCA.  Where all buildings are demonstrably identical in design and specification (and differ only in scale), a representative LCA approach may be used (see KBCN1890). Shared elements (e.g. substructure, external works, or building services serving multiple buildings) may be apportioned between buildings using a reasonable and transparent method (e.g. by gross internal area or other appropriate project-specific metric), in line with recognised industry approaches. For the purposes of BREEAM benchmarking under Mat 01: • The results submitted to the platform must represent a single building, not a combined site-wide result. • Where multiple buildings are included within an assessment, the worst-performing building (in kgCO₂e/m²) must be used for benchmarking in line with the Similar Buildings methodology (section 4.2 of GN20). Full evidence must be provided to demonstrate: • That all buildings within scope of the assessment have been included, with individual LCAs completed for each building, and • How results have been separated and, where relevant, how shared elements have been allocated.
Rationale: In line with Section 4.2 of GN20, BREEAM issues must be assessed for each individual building, with credits awarded based on the worst‑performing building for each assessment issue. The Similar Buildings approach therefore remains an individual‑building assessment methodology and does not constitute a site‑wide assessment, even where multiple buildings are included.
09.07.2026 Reference to KBCN1890 added

Life Cycle Assessment – Similar buildings with identical design (GN20 Section 4) – Representative LCA approach - KBCN1890

Where multiple buildings are substantially identical in design, construction and specification, and any differences are limited to scale, a representative LCA approach may be used instead of completing a full LCA for every building. Where buildings are not substantially identical, see KBCN1834. For the purposes of BREEAM benchmarking under Mat01: Demonstrating representativeness does not require full LCAs for additional units; proportionate methods such as parametric scaling of quantities or elemental intensity comparisons may be used to evidence that variation in normalised results is not materially significant. Where there is uncertainty regarding representativeness, a secondary check model for an additional unit is recommended to verify consistency of results.
Rationale: The representative LCA approach provides a proportionate means of assessing developments containing multiple highly similar buildings while maintaining confidence that reported results are representative of individual building performance. It is intended as a limited exception to the standard requirement for building-specific assessment.

Suitably qualified third-party verifiers – LCA training courses - KBCN1909

Purpose Mat 01 requires the third-party verifier to demonstrate knowledge of the LCA sector, including relevant standards, EPD programmes and regulations (see Definition: Suitably qualified third party). Examples of relevant LCA training courses Below are examples of training courses that BRE considers as meeting this knowledge requirement, and which can support assessors and verifiers in evidencing compliance: This list is illustrative, not exhaustive. Completion of one of these courses is one way to evidence the knowledge requirement. It does not replace the other criteria under Suitably qualified third party. Equally, a verifier who has not completed one of the above courses may still qualify if they can otherwise demonstrate the required knowledge. Requesting an addition to this list Training providers or assessors wishing to propose a course for inclusion should contact breeam@bregroup.com and include BREEAM Relevant LCA training course – addition request in the Subject field.
Information correct as of 10thSeptember 2026. Please see kb.breeam.com for the latest compliance information.