New Construction / UK / V6 / 01 Management /
Man 01 - Project brief and design
Information correct as of 21stJuly 2026. Please see kb.breeam.com for the latest compliance information.
BREEAM Advisory Professional (AP) – Retrospectively applying AP status - KBCN1080
The AP status cannot be applied retrospectively. The purpose of using an AP on a project is that they can advise and steer the development from the outset to maximise its BREEAM and sustainability performance for the least cost/risk. If early AP appointment and involvement does not occur then the aims and criteria of this BREEAM issue are not being met.
BREEAM AP – Change of BREEAM APs/Sustainability champions during project - KBCN0295
Whilst it would generally be preferable to retain the same individual in the role of BREEAM AP/Sustainability champion throughout the design and construction of a particular project for the purposes of continuity, we appreciate that this may not always be feasible. It is therefore entirely appropriate that the three credits available for using BREEAM APs/Sustainability champions can still be awarded where the individual performing the role changes (provided the ongoing involvement of an AP/SC is maintained in accordance with the criteria).
Prerequisite for BREEAM AP credits (Concept and Developed Design) - KBCN1050
Agreeing on strategic performance targets aims to ensure BREEAM is considered early enough to influence the design and that relevant requirements do not increase the cost due to their late consideration. The project is not penalised if these targets are not met as the BREEAM credits can still be awarded. Justification should, however, be provided explaining the reasons why the targets have not been met.
Project delivery planning – Operational energy - KBCN1237
There is no interdependence between the Ene 01 requirement and achieving Man 01. The reference of Ene 01 within Man 01 Operational Energy aims to highlight what aspects of operational energy the design team should be considering in terms of Man 01 (and assuming Ene 01 is being targetted). If Ene 01 is not being targetted, then the reference is not relevant. However, compliance with Man 01 would still require appropriate consideration of operational energy.
Soft Landings Framework - KBCN1263
Embedding the principles of the Soft Landings Framework within a project can be used to demonstrate compliance with various aspects of the BREEAM criteria, particularly the Management issues.
Stakeholder consultation – Building occupier unknown - KBCN0227
Where the building occupier is unknown, it is still possible to achieve the credit. The end user requirements must be assumed and considered by other project parties (e.g. client, design team, etc.) using their experience and judgement until such time as the occupier is known.
Stakeholder consultation – Existing shared facilities - KBCN0360
The consultation must include any existing shared facilities relied on to achieve compliance as well as the new facilities.
To ensure the shared existing facilities are appropriate and in line with the users' requirements.