Appropriate project stage to appoint a suitably qualified acoustician - KBCN0256

BREEAM requires that a suitably qualified acoustician is appointed at an appropriate stage of the project, so as to ensure that early design advice on criteria of pre-requisition is met. The aim is to ensure that costly amendments to building designs are not made as a result of late appointment of the acoustician. Ultimately, it is for the assessor to determine at what stage of the project is deemed to be appropriate for this appointment to have taken place given the project specific circumstances and procurement type.  

Prerequisite – Users with special hearing and communication needs - KBCN0969

Intent Criterion 1c ensures that the suitably qualified acoustician has influenced the design of the asset to: What this should cover will depend on the asset type and expected users. Asset users The UK Department for Education document BB93 Acoustic design of schools: performance standards building bulletin 93 (February 2015) defines users with special hearing or communication needs as those with any of the following: This list is not exhaustive, and the suitably qualified acoustician must consider typical asset users, along with the other points a-d when giving early design advice regarding room layout, sound insulation and reverberation times. Accessibility features The principles of accessible design are universal and could be applied in a wide range of assets. Additional features that could be relevant to accessible acoustic design include, but are not limited to: The suitably qualified acoustician must use their professional judgement to determine the scope of any such features as part of the design. Where no features are applicable this must be clearly justified.
04-Sep-2024: Wording and intent clarified. Information on additional accessibility features added. Scheme applicability updated. Title updated.
01-Mar-2019: Amended to clarify that this is a 'typical' list of users, but does not impose a new requirement.

Remedial works – timing of acoustic re-testing - KBCN1164

The intent of CN "Remedial works" is that, where these are required, re-testing is carried out prior to handover and occupation. However, it is permissible to carry out the re-testing post-occupation. This is provided any specific guidance for particular building types related test conditions have been met (for instance, it may be that some building specific guidance requires furniture or carpets to not be present during the testing). Compliance cannot be achieved based on a letter from the SQA confirming that the contractor has followed their advice to achieve the required performance.
07.11.18 KBCN amended to allow for re-testing to be carried-out post-handover.