Refurbishment and Fit Out / International / 2015 / 08 - Land Use and Ecology /

LE 02 - Protection of Ecological Features

Information correct as of 21stDecember 2024. Please see kb.breeam.com for the latest compliance information.

Aircraft safety – developments in the proximity of airports - KBCN0977

Where it can be demonstrated that an assessed development, within or adjacent to an airport or similar must restrict the ecological value of the site for reasons of aircraft safety (mitigating the risk of bird-strikes to meet ICAO/EASA/CAA or equivalent regulations), the approach for some issues in the Land Use and Ecology category can be adjusted. If in these circumstances, the client wishes to enhance ecological value on an external site, outside of the main development site, this can be considered in the following way for each issue: Ecological value of site and protection of ecological features: The development site only must be assessed, but the recommendations may be tailored to suit the requirements of the relevant legislation. Enhancing site ecology: The development site and the external site must be included in the SQE’s report and recommendations, albeit that, for the development site, the approach may to be to restrict biodiversity. Enhancements implemented in-line with the recommendations of the SQE are likely to apply to the external site. Long term impact on biodiversity: Both sites must be considered in the SQE’s report, albeit that, for the development site, the approach may to be to restrict biodiversity. Credits for additional measures to improve the site’s long-term biodiversity can be awarded on the basis of adopting these for the external site only, in line with the guidance.

International suitably qualified professionals - KBCN1266

In some issues the International NC and RFO schemes prescribe specific requirements for suitably qualified professionals. We appreciate that some countries might have different recognition schemes in place, and these might differ from the BREEAM requirements. Where this is the case, assessors should submit a technical query with appropriate information, and we will review and approve each situation on a country basis.

Measures for protecting features of ecological value - KBCN0583

Where the actions outlined in CN 'Protecting features of ecological value' are deemed not appropriate for a particular site, by a suitably qualified ecologist (SQE), it would be acceptable for alternative means of protection to be used where recommended by an SQE. Where alternative approaches are being used, the assessor must ensure that adequate evidence is collated to demonstrate the ecologists recommendations have been implemented, this should include clear photographic evidence of the solution implemented. This is to ensure that professional expertise is applied to appropriately address specific scenarios.

Risk to Ecologist’s safety - KBCN0704

In some situations a significant safety risk may prevent a suitably qualified ecologist from attending the site to undertake a site survey. In these cases a desktop study can be used to demonstrate compliance, where the ecologist confirms that it is an acceptably robust substitute. In these cases, the assessor must provide evidence to confirm the type of significant safety risk present.  

Shared ecological enhancements - KBCN0656

A site-wide approach to ecological enhancements can be used on sites where multiple buildings share areas of soft landscaping. The enhancement benefits are applied to the individual building assessments within the site. Similarly, where a building comprises more than one assessment, eg different floor assessments, a green roof on top of that building can be used to award credits for each assessment for which the Land use and ecology issues apply. The benefit can be applied on a site-wide basis provided all developments are completed within the appropriate timeframe of a valid ecological survey.    

Temporary ecological enhancements prior to development - KBCN00065

Where a site has been acquired but development is not scheduled to start immediately, it is possible to determine the baseline ecological value of the site at this point. Furthermore, to recognise where positive measures to enhance ecology have been taken to manage the site until development starts, these enhancement measures will not impact on the baseline value for the purposes of the BREEAM assessment, provided that the following have been met: Clarification: This guidance is currently under development. Please contact BRE Global with specific project details for confirmation of whether this approach may be used. The aim of these issues is to demonstrate the impact that a project has had on the site ecology, but comparing the site pre and post development. BREEAM does not want to penalise sites that have put in temporary ecological enhancements that enhance the ecology while waiting for development to begin.
Information correct as of 21stDecember 2024. Please see kb.breeam.com for the latest compliance information.