New Construction / International / 2016 / 09 - Pollution /

POL 02 - NOx emissions

Information correct as of 29thMarch 2024. Please see kb.breeam.com for the latest compliance information.

Backup or emergency heating systems - KBCN0936

NOx calculations should be based on permanent heating systems and should not include backup systems used for maintenance or in emergencies. BREEAM assessments measure the as designed performance level of the building as it normally functions.

CHP NOx emission conversion - KBCN0592

If the CHP manufacturer cannot provide the NOx emissions in mg/kWh it is not possible to award any credits. The CHP manufacturer must provide the NOx emissions in mg/kWh, the conversion factors provided in the Technical Manual can only be used for boilers.

CN 3.3 Low NOx grid electricity - KBCN0886

CN3.3 was accidentally copied in the reissue v.2.0 and should be ignored. It will be removed in the next reissue.
Technical manual to be updated accordingly in next reissue.

District heating systems - KBCN0979

District heating systems serving the assessed building must be assessed for NOx emissions.
14-Dec-24 - Wording clarified.
07-Dec-17 - Reference to NOx emissions clarified

District heating systems which off-set grid electricity - KBCN0857

District heating systems which incinerate waste usually have NOx emissions higher than the levels set to achieve any BREEAM credits. However, where a district heating system also generates electricity, this can be used to off-set NOx emissions from grid electricity. In such cases, the calculation methodology for CHP systems can be used to calculate NOx emissions for the district heating network.

Emissions – measuring heating demand - KBCN0182

Emissions for all heat sources should be measured under normal operating conditions which are when all heat sources from the building plant are operating to their maximum design heat outputs to meet the building's heating demands. Where plant is designed to operate below maximum capacity, for example multiple or modular systems or standby boilers,the emissions should still be calculated for the plant operating to meet the building’s heating demand. Any redundant capacity or standby plant should not be included.  

Heat pumps powered by renewable energy - KBCN0422

Where renewable energy is used partially to offset grid electricity in heat pumps, this can contribute towards a reduction in equivalent NOx emissions. To account for seasonal variations in renewable energy generation, this must be calculated over the course of a year.

LZC technologies – energy centre or other LZCs connected at a later stage - KBCN0267

If a project specifies LZCs that have been proposed in the feasibility report which reduce emissions, and/or will be connected to a site-wide energy centre operational at a later stage of the phased development, after the Post Construction Stage review has been submitted, the Energy and Pollution issues can be assessed as follows: In a phased development where the primary heating system will be upgraded at a later stage than the building being assessed, a commitment to install the new heating source must be made in the General Contract Specification (as per the BREEAM requirements). BREEAM does not specify a particular time for phasing as it is difficult to set parameters, however as a rule building users should have to wait the least time possible before they can use the upgraded heating source. For the quality audit, two Energy model outputs/EPCs must be produced at the final stage - one with the actual interim system installed for building control, and one for the BREEAM assessment which can include the predicted energy from the proposed energy centre.  Additionally, the legally binding general contract specification for the new heating source must be submitted with details of the timescales proposed for the completion of the second phase of work. Where this approach is to be followed BREEAM must be consulted in each case to ensure that the arrangements are sufficiently robust to award the credits. BREEAM seeks to recognise the environmental impacts of a building's energy use throughout its life, therefore temporary arrangements can be accommodated, provided there is robust evidence on future connection to the permanent systems.
24/08/2022 - Applicability to UKNC V6 confirmed

Table 58 and CN3.2 Grid electricity amendments - KBCN0887

Table 58 and the third paragraph in CN3.2 were accidentally copied in the reissue v.2.0. Table 58 should be ignored and the compliance note should read as follows: CN3.2 Grid electricity Heating systems powered by grid electricity can be considered to have zero NOx emissions. If all heating in the building is provided by grid electricity the credits can be awarded by default.  The reason for this is based on the aim of this issue, which is to improve local air quality.
Technical manual to be updated accordingly in next reissue.

Information correct as of 29thMarch 2024. Please see kb.breeam.com for the latest compliance information.