Where it can be demonstrated that liaison and collaboration between the project team and the representative stakeholder occurred later than the early design stages (typically post-RIBA Stage 2 or equivalent), the criteria may still be met if a suitably qualified ecologist confirms that these late discussions have not compromised the site’s ability to achieve its optimal ecological outcome, in accordance with the mitigation hierarchy of action:
1. Avoidance.
2. Protection.
3. Reduction or limitation of negative impacts.
4. On-site compensation.
5. Enhancement considering the capacity and feasibility within the site, or where this is not viable, off-site.