Timing of Ecological survey/report

If the ecologist’s site survey and/or report is completed at a later stage than required, the assessor would need to be satisfied that it was produced early enough for the recommendations to influence the Concept Design/design brief stage and leads to a positive outcome in terms of protection and enhancement of site ecology.

30-Oct-2025 - Applicable to all HQM versions and UKNCR V6.1
21/02/2017 Wording clarified.