Contractor not yet appointed at the design stage – Site waste management

Where the contractor has not been engaged at the design stage certification, it is acceptable to award the credits based on a commitment. This commitment must be from a suitable member of the design team, and must detail the targets and criteria which must be met. Evidence must also confirm that the details in the commitment will form part of the contractual requirements.

Note: This does not apply to the requirement for a pre-demolition/pre-refurbishment audit, which must be undertaken at Concept Design Stage.

30-Oct-2025 - Applicable to HQM One, HQM V6 and UKNCR V6.1
12 Jul 2022 - Note added to clarify the scope of this guidance