Some criteria related to thermal zoning and controls may not be applicable to Part 2 assessments.
These should, however, be addressed as far as possible within the work to the core services and associated infrastructure, given the scope of works. Where compliance with any requirement is not possible, this should be justified by the design team in the evidence for this Issue.
03.11.2020 Amendment made to issue 2.0 of UK RFO technical manual to include the above in a Compliance Note. This KBCN is relevant to previous issues of the manual. 10/02/2017 - This replaces the previous CN which stated, incorrectly, that the criteria relating to thermal zoning do not apply to Part 2 assessments. This approach now aligns with the BREEAM manual and the scoring & reporting tool.