If the scope of works does not include external lighting and it can be demonstrated that the building will not require external lighting once fitted-out and in operation, the external lighting requirements can be assumed to be met.
22/01/2018 KBCN wording amended to extend applicability to all types of assessments. 28/06/2018 Applicability to International New Construction 2016 and Refurbishment and Fit-Out 2015 removed.