GN14 BREEAM UK New Construction 2014 scheme assessment timeline

BREEAM UK New Construction 2014 scheme assessment timeline

Introduction
The assessment timeline has been produced to assist with optimising project sustainability performance. It outlines at which RIBA stageĀ credits should be addressed and ideally when these should be considered by the design team, planner, contractors, owners/occupiersĀ and other members of the project team to achieve the highest possible BREEAM rating at the minimum cost. It demonstrates that whereĀ BREEAM advice is taken on too late within the design and construction phases a number of BREEAM credits may not be achieved.

View full Guidance NoteĀ (licensed assessors only)

View all Guidance Notes (licensed assessors only)