Evidence: Final design/’as-built’ drawings as evidence

Where drawings are not clearly marked¬†to indicate their ‘as-built’¬†status, additional evidence would need to be provided by¬†the¬†design team¬†to confirm the drawings represent the completed development¬†and that there¬†have been¬†no changes¬†relevant to¬†the BREEAM/HQM assessment. This could, for example,¬†be a written confirmation from the architect or the contractor, as appropriate.