Evidence: Final design/’as-built’ drawings as evidence

Where drawings are not clearly marked┬áto indicate their ‘as-built’┬ástatus, additional evidence would need to be provided by┬áthe┬ádesign team┬áto confirm the drawings represent the completed development┬áand that there┬áhave been┬áno changes┬árelevant to┬áthe BREEAM/HQM assessment. This could, for example,┬ábe a written confirmation from the architect or the contractor, as appropriate.