It is recognised that shell only developments may only include a capped-off water supply, with responsibility for installing the water meter and leak detection system resting with the incoming tenant. In such cases, compliance can be demonstrated where the spatial arrangements, distribution strategy and infrastructure can be shown to facilitate future compliance.
This could be demonstrated by evidence such as schematic drawings showing how compliance can be achieved for the assessed development at the fit-out stage.
Whilst shell only assessments are intended to consider only aspects which fall within the scope of such developments, in order that the aim of the Issue can ultimately be met, the works should not preclude future compliance.