Shell only – retail glazing not within scope

Where a retail building envelope is not complete and glazing will be provided by the future tenant/(s), there are two options available:

A ‘Green fit-out agreement’ (see Definition under this Issue in the technical manual) can be used to ensure that the performance level of the glazing used in the energy model is met in the completed building. This must be accompanied by evidence that the performance of the assumed glazing does not impose overly onerous requirements on future tenants and that it falls within the scope of glazing typically used in retail developments.

Alternatively, the assessment can be based on worst permissible performance under the relevant national building regulations.

In all cases, for shell only assessments, the assessment method detailed in CN1 (for UK New Construction 2014 and International New Construction 2016) and Assessment type specific note 1.3 (for UK New Construction 2018) must be followed.

14 11 2017 Wording amended to clarify the intent