Sites with multiple assessed buildings

For sites with multiple assessed buildings, where it proves difficult to clearly define separate construction zones for each building, the assessment of this Issue can be done on a site-wide basis where the boundary of the construction zone is considered to be the whole site.

Similarly, when it is difficult to define the proposed development footprint for each assessment, the issue can be assessed on a site-wide basis.

This can be applied to each BREEAM assessment.