Evidence for ’04 Detailed monitoring and reporting’ at design stage - KBCN1232
The evidence requirements associated with ‘04 Detailed monitoring and reporting’ for Design Stage in both the 'Construction Water and Energy Use' are incorrectly formatted and should appear in the Post-Construction Stage column.
For design stage evidence requirements, please refer to
KBCN1231 'Design Stage evidence requirements when a contractor has not been appointed'
Information correct as of 14