Design Stage evidence requirements when a contractor has not been appointed

Where a contractor has not been appointed at the time of the design stage assessment, a contractually binding document, such as the Employers Requirements, may be used as evidence to demonstrate that the criteria will be met.

Ultimately, the assessor should satisfy themselves that the evidence provided at design stage ensures that the criteria will be met later on in the project.