New Construction / UK / V6 /
08 Land Use and Ecology
Information correct as of 26thFebruary 2026. Please see kb.breeam.com for the latest compliance information.
Aircraft safety – developments in the proximity of airports - KBCN0912
Where it can be demonstrated that an assessed development, within or adjacent to an airport or similar, must restrict the ecological value of the site for reasons of aircraft safety (mitigating the risk of bird-strikes to meet local or national regulations), the approach for some issues in the Land Use and Ecology category can be adjusted. If in these circumstances, the client wishes to enhance ecological value on an external site, outside of the main development site, this can be considered in the following way for each issue:
Site selection: The development site only must be assessed.
Ecological value of site and protection of ecological features: The development site only must be assessed, but the recommendations may be tailored to suit the requirements of the relevant legislation.
Enhancing site ecology: The development site and the external site must be included in the SQE’s report and recommendations, albeit that, for the development site, the approach may to be to restrict biodiversity. Enhancements implemented in-line with the recommendations of the SQE are likely to apply to the external site.
Long term impact on biodiversity: Both sites must be considered in the SQE’s report to meet the prerequisite/first credit as applicable, albeit that, for the development site, the approach may to be to restrict biodiversity. Further credits in relation to improving and maintaining the site’s long-term biodiversity can be awarded on the basis of adopting these for the external site only, in line with the guidance.
Ecological enhancement implementation time-frames - KBCN1196
At the Post Construction Assessment stage of large or phased developments, for example, some ecological enhancements may not have been completed. This may include features which are to be added at a later date in the appropriate planting season. In such cases, it is acceptable to provide evidence from the client or principal contractor confirming that the enhancements will be completed within an appropriate period, advised by the SQE.
04-Nov-2025 – Applicable to BREEAM NOR NC V6
30-Oct-2025 - Applicable to HQM V6 and UKNCR V6.1
Ecology dependency diagrams - KBCN1456
These dependency diagrams show how ecology prerequisites and credits interact across issues in the ecology category.
UK New Construction
UK NC ecology dependencies rev 0.0
Applies to:
Home Quality Mark
HQM V6 ecology dependencies rev 0.0
Applies to:
30-Aug-2023 - HQM ecology dependency diagram added. Title and scheme applicability updated.
Measuring ecological change – Using Defra Metric 3.0, 3.1, 4.0 and the Statutory Biodiversity Metric - KBCN1476
Defra Metric 3.0, 3.1 and 4.0 have been mapped to the BREEAM Change in Ecological Value Calculator and can be used in assessments for BREEAM UK New Construction 2018, BREEAM Infrastructure Version 6 (formerly CEEQUAL Version 6), and Home Quality Mark ONE.
Please see the table below for the applicable benchmarks where Defra Metric 3.0, 3.1 or 4.0 is used. The benchmarks from the Defra Metric are taken from the lowest score from the three metrics (Habitat, Hedgerow, River).
If a metric is not present, e.g. there is no river on the site, the score of 0 for that metric must be ignored when taking the lowest score.
| Metric result |
Credits awarded |
| BREEAM (GN36) / Defra Metric 2.0 |
Defra Metric (3.0, 3.1, 4.0)
and the Statutory Biodiversity Metric |
BREEAM UK NC 2018 |
HQM ONE |
BREEAM Infrastructure V6 |
| Less than 75% |
Less than -25% |
0 |
0 |
0 |
| Between 75% and 94% |
Between -24% and -6% |
1 |
2 |
10 |
| Between 95% and 104% |
Between -5% and 4% |
2 |
4 |
20 |
| Between 105% and 109% |
Between 5% and 9% |
3 |
6 |
30 |
| 110% and above |
10% and above |
3 + 1 exemplary level credit |
8 |
40 |
The above approach can be used to determine the percentage score that describes ecological change in Guidance Note 36 (Table 9: Reward Scale), if the following is also met:
- A Suitably Qualified Ecologist confirms that they have used the Defra Metric tool to measure ecological change in line with up to date good practice regarding the Mitigation Hierarchy and Biodiversity Net-Gain including CIEEM, CIRIA & IEMA, 2019, Biodiversity Net Gain. Good practice principles for development: A practical guide (https://cieem.net/i-am/current-projects/biodiversity-net-gain/)
- The Methodology sections of the relevant ecology assessment issues are followed
- All other relevant criteria are met
- One calculation tool is used consistently throughout the development to determine the change in ecological value. i.e. A mixture of outputs from the BREEAM Ecological Change tool and Defra Metric cannot be combined
Alternatively, the BREEAM Change in Ecological Value calculator tool will continue to be accepted until stated otherwise.
30-Oct-2025 - Applicable to HQM V6 and UKNCR V6.1
03 Mar 2022 - Updated to clarify how Defra Metric 3.0 can be applied to current schemes
27 May 2022 - Updated to Defra Metric 3.1
21 Sep 2022 - Clarification on the figure to use from Defra Metric 3.0 or 3.1
14 Oct 2022 - Updated following rebrand of CEEQUAL to BREEAM Infrastructure
16 Feb 2023 - Added rules and clarification from KBCN1407.
01 Jun 2023 - Addition of DEFRA Metric 4.0
Information correct as of 26thFebruary 2026. Please see kb.breeam.com for the latest compliance information.