Electric vehicle charging points – Communal parking – fast-charging infrastructure

For 0.25 points, compliance may be demonstrated by installing all the necessary fast-charging infrastructure and not the EVCP itself, i.e. capacity in the connection to the local electricity distribution network and distribution board (minimum 7kW to each EVCP). Additionally, sub-surface ductwork to receive cabling to parking spaces must be installed, thus enabling the simple installation and activation of charging points at a future date.