Electric vehicle charging stations – shell & core assessments

For BREEAM NC shell only/shell & core, RFO Parts 1 and 2 only and partially-fitted residential assessments, compliance can be demonstrated by installing all the necessary infrastructure, (i.e. capacity in the connection to the local electricity distribution network and distribution board, as well as sub-surface ductwork to receive cabling to parking spaces), to enable the simple installation and activation of charging points at a future date.

18/10/2021 Applicability to BREEAM Scheme and Assessment Type clarified, in line with the intent.
15/11/2019 Incorrect reference to pre-installation of 'cabling' removed.