The assessment timeline has been produced to assist with optimising project sustainability performance. It outlines at which RIBA stage credits should be addressed and ideally when these should be considered by the design team, planner, contractors, owners/occupiers and other members of the project team to achieve the highest possible BREEAM rating at the minimum cost. It demonstrates that where BREEAM advice is taken on too late within the design and construction phases a number of BREEAM credits may not be achieved.