If a feasibility study is undertaken at a stage later than Concept Design, this must include an explanation for any local LZC technologies ruled out because of constraints arising from the late consideration. Compliance may still be achieved if other LZCs are feasible and the criteria are met. If the late completion of the feasibility study resulted in no LZC being installed, the credit must be withheld.