Feasibility study – comparison with connection to existing LZCs Created: 08th Nov 2016 Reference: KBCN0563
LZC technologies – energy centre or other LZCs connected at a later stage Created: 06th Jun 2016 Reference: KBCN0267
Manual errata – Passive design – Industrial assets with no occupied spaces Created: 13th Jan 2022 Reference: KBCN1492
Modelling basecase for Low/Zero carbon technology – efficiency of gas boiler Created: 06th Jun 2016 Reference: KBCN0297
Passive design analysis – Modelling the standard building when existing building elements are retained Created: 25th Mar 2019 Reference: KBCN1270
Quantifying the reduced total energy demand and CO2 emissions resulting from passive design measures Created: 05th Jul 2024 Reference: KBCN1677