The words in bold are missing from the ‘Monitoring progress and providing feedback’ methodology section:
‘….during the Concept Design, Developed Design stages, and during the Technical Design stage (where appropriate or helpful for achieving the Man 03 BREEAM AP site credit), as defined by the RIBA Plan of Work 2013′.
The additional text will be added to the manual re-issue.