Individual and shared drying facilities in larger developments

Individual bedrooms: an adequate internal or external space with posts and footings, or fixings capable of holding:

  • Two metres of drying line per bedroom where drying facilities are provided in each room, OR;
  • Two metres of drying line per bedroom for the first 30 bedrooms, plus one metre of drying line for each additional bedroom where drying facilities are shared.

This is to avoid over-provision of shared drying facilities in larger developments.