The requirement to provide a dedicated space for the segregation and storage of operational recyclable waste, as well as relevant facilities (e.g. for large amounts of packaging and/or compostible waste), relates to the building, not the occupier or the local authorities. A dedicated space and facilities must be provided irrespective of the waste management practices of the relevant stakeholders.
The BREEAM certification relates to the building, not the occupier’s or the local authorities’ waste management practices. Therefore, the provision of a dedicated space and the relevant facilities is required to ensure the building’s operational recyclable waste streams is diverted from landfill.