No change in impermeable area

The Methodology includes a section titled ‘No change in impermeable area’.  Where this text is applied to a site, and the Surface Water Run-off – Rate credit is not targetted, criterion 5 is not applicable because no calculations or surface water design solutions are required.

Note: the design for exceedance criterion (criterion 10) must still be demonstrated.