Option 1 for Scotland

The Option 1: Whole Building Energy Model methodology is only compatible with English and Welsh EPCs.

As the Scottish EPC methodology differs, projects in Scotland will need to generate an English EPC file to upload to the system.

This will be clarified in the next re-issue of the manual.