Pre-requisite compliance at post construction

Criterion 1 is a pre-requisite, requiring early design advice to be given by a suitably qualified acoustician.Β  For the post construction review/assessment, evidence must confirm that this advice was given at the correct time, with the credits awarded based on the test results and performance of the building. Β Where the pre-requisite requirements have not been met no credits can be awarded.