Project delivery planning – Operational Energy

There is no interdependence between the Ene 01 requirement and achieving Man 01. The reference of Ene 01 within Man 01 Operational Energy aims to highlight what aspects of operational energy the design team should be considering in terms of Man 01 (and assuming Ene 01 is being targetted). If Ene 01 is not being targetted, then the reference is not relevant. However, compliance with Man 01 would still require appropriate consideration of operational energy.