Where new non-adoptable highways are built, all new impermeable surfaces must be included in the calculations to demonstrate compliance with the peak rate of run-off and volume of run-off criteria. Where buildings are built beside existing highways or where adoptable highways are built, the impermeable area of the highway does not need to be included in the calculations.
Twitter
LinkedIn