Surface water run-off – Highways and impermeable areas

Where new non-adoptable highways are built, all new impermeable surfaces must be included in the calculations to demonstrate compliance with the peak rate of run-off and volume of run-off criteria. Where buildings are built beside existing highways or where adoptable highways are built, the impermeable area of the highway does not need to be included in the calculations.